Workplan
WP1
Management, contracting, and daily coordination (1.10.2006 – 30.9.2008)
WP2
Educational needs analysis and existing educational provision (1.10.2006-30.6.2007)
WP3
An interactive multinational portal development 1.10.2006-31.10.2007.
WP4
Piloting the Portal (1.2.2007-30.6.2008)
WP5
Valorisation (1.10.2006-30.9.2008)
WP6
Evaluation (10.2006-30.9.2008)


